
For contractors and distributors sourcing high mast pole, the High Mast Pole with Integrated Solar Street Lights for Stadiums street lights is supplied complete — unit, mounting hardware, foundation data where relevant and the export documentation needed to clear customs in your country.
| Height | 15 / 18 / 20 / 25 / 30 / 35 / 40 m |
| Structure | 12- or 16-sided polygonal tapered sections with flanged joints |
| Material | Q345B high-strength steel, plate thickness 4–10 mm |
| Surface | Hot-dip galvanized inside and out; optional two-coat painting |
| Head frame | Lifting-type ring frame with fall-arrest device, manual or electric winch |
| Luminaires | 400 W – 2000 W LED flood lights, 1–24 lamps per mast |
| Wind design | Engineered per project site, typically 35–42 m/s design wind speed |
| Maintenance | Winch lowers the lamp carriage to ground level — no crane or climbing crew |
| Foundation | Concrete foundation drawing, anchor cage and grouting plan supplied |
| Warranty | 15+ years on structure, 3–5 years on luminaires |
| Working temperature | -20°C to +60°C (extended range available for extreme climates) |
| MOQ | 1 set for sample order; 20-50 sets for volume orders (confirmed on the proforma invoice) |
| Delivery time | 7-15 days for samples; 15-30 days for bulk orders by sea freight |
| Packaging | Export-grade carton with foam protection; wooden case for poles and fragile parts |
Specifications are indicative for this model family and are confirmed on the proforma invoice. Custom ratings available on request.
Ordering direct from the factory also means engineering support: send us the road width, pole height and local sunlight hours and we will return a sizing calculation, not just a price.
Related reading: how to choose a solar street light, factory price list and the full high mast pole range.
Yes. Sample orders from 1 pc are welcome and mixed models are accepted. Samples usually ship in 2–5 working days by DHL, UPS, FedEx or TNT.
Mass production normally runs 3–5 weeks after deposit depending on height, quantity and whether painting is required, plus sea transit.
Yes. We build single-unit high mast orders. Because masts ship by sea in sections, the sample lead time is typically 3–4 weeks including galvanizing.
T/T with 30% deposit and 70% against the bill of lading, or L/C at sight for larger orders. Terms are confirmed on the proforma invoice.
Send quantity, mounting height and project location — quotation within 24 hours.
WhatsApp Us Now