
Family reference image — exact model photos and drawings sent on request.
We build the 15m–35m High Mast with Lifting System for Airport to order rather than sell from stock, which means the high mast pole can be matched to your project's mounting height, ambient conditions and autonomy requirement instead of being forced into a catalogue specification.
| Height | 15 m |
| Available Height range | 15 / 18 / 20 / 25 / 30 / 35 / 40 m |
| Structure | 12- or 16-sided polygonal tapered sections with flanged joints |
| Material | Q345B high-strength steel, plate thickness 4–10 mm |
| Surface | Hot-dip galvanized inside and out; optional two-coat painting |
| Head frame | Lifting-type ring frame with fall-arrest device, manual or electric winch |
| Luminaires | 400 W – 2000 W LED flood lights, 1–24 lamps per mast |
| Wind design | Engineered per project site, typically 35–42 m/s design wind speed |
| Maintenance | Winch lowers the lamp carriage to ground level — no crane or climbing crew |
| Foundation | Concrete foundation drawing, anchor cage and grouting plan supplied |
| Warranty | 15+ years on structure, 3–5 years on luminaires |
| Working temperature | -20°C to +60°C (extended range available for extreme climates) |
| MOQ | 1 set for sample order; 20-50 sets for volume orders (confirmed on the proforma invoice) |
| Delivery time | 7-15 days for samples; 15-30 days for bulk orders by sea freight |
| Packaging | Export-grade carton with foam protection; wooden case for poles and fragile parts |
Specifications are indicative for this model family and are confirmed on the proforma invoice. Custom ratings available on request.
Most of our export orders ship as mixed containers, so you can combine this model with other families and consolidate freight instead of paying for several shipments.
Related reading: how to choose a solar street light, factory price list and the full high mast pole range.
MOQ is low — even 1 pc for samples. Mass production normally takes 1–2 weeks after deposit, depending on quantity and season.
The lifting head-frame lowers the lamp carriage to ground level with a manual or electric winch, so no crane or climbing crew is needed for lamp replacement.
T/T with 30% deposit and 70% against the bill of lading, or L/C at sight for larger orders. Terms are confirmed on the proforma invoice.
Yes. We build single-unit high mast orders. Because masts ship by sea in sections, the sample lead time is typically 3–4 weeks including galvanizing.




Send quantity, mounting height and project location — quotation within 24 hours.
WhatsApp Us Now